Project Case Study

Classic White Kitchen Remodel with Warm Wood Accents

Felida — Vancouver, WA 98685

The Walden family loved two things about their Felida kitchen: the open plan, and the white cabinets. Everything else was holding them back. There were never enough cabinets, there was no pantry at all, the range and its hood were too small for how they cook, and the layout didn’t make it easy to spend time in the room. Serden Group designed and built a kitchen that keeps the white and the openness and fixes the rest — a new load-bearing beam and a new wall to create a walk-through butler’s pantry behind arched openings, a floor-to-ceiling pantry wall with a hidden refrigerator, a pro-style range under a custom hood, six slabs of quartz, and lighting built into the cabinetry. About three months from demolition to walkthrough.

Location
Felida
Vancouver, WA
Scope
Design-build kitchen
& butler’s pantry
Timeline
About 3 months
start to walkthrough
Investment
$130,000–$170,000
all-in
Finished classic white kitchen remodel in Felida, Vancouver WA, with a stained wood island, brass pendants, a curved painted range hood and a floor-to-ceiling pantry wall
The finished kitchen: white shaker cabinetry kept from the original brief, a stained wood island, the curved custom hood over a pro-style range, and the new floor-to-ceiling pantry wall on the right with the refrigerator hidden inside it.
The Starting Point

A kitchen they liked, that ran out of room

This wasn’t a kitchen anyone wanted to tear out for the sake of it. It was bright, it opened onto the breakfast area and the family room, and the homeowners liked its white cabinets enough to ask us to keep the color. The problem was capacity. The cabinet runs stopped short, a long built-in window seat sat where storage could have gone, and with no pantry every box of cereal and every small appliance was competing for the same few cabinets.

The cooking side had fallen behind, too. The range was smaller than the family wanted for everyday cooking, with a narrow stainless hood above it that didn’t move much air, and black granite and dark tile made the work zone feel heavier than the rest of the room. The Waldens wanted a kitchen they would actually spend time in — more storage, a bigger stove, better ventilation and a better layout — without losing what they already liked about it.

The original Felida kitchen before remodeling, with black granite counters, a long white island and a small stainless hood over the range
Before The original kitchen: white cabinets, black granite and a small hood
The same kitchen after remodeling, with white shaker cabinets kept, a stained wood island, a curved painted range hood and quartz counters
After White kept, wood island added, and a hood sized for a pro range
The original range before remodeling, under a narrow stainless hood with a dark tile backsplash and black granite
Before The old range and its undersized hood
The new pro-style dual-fuel range under a custom curved hood, with a full-height quartz slab backsplash cut around it
After A larger range, a custom hood and a full-height quartz slab backsplash

Six of the homeowners’ photos of the original kitchen are below — select any of them to open the full gallery.

Design & Construction Solution

Keep the white, keep the openness, rebuild the rest

The brief was clear about what to keep and what to change, which shaped every design decision:

You can’t add a pantry, a wall of tall cabinets and a bigger cooking zone to a kitchen without finding space somewhere, and in this house the space was in the walls. Restructuring the layout around a new load-bearing beam let us build a new wall and carve out a walk-through butler’s pantry, while the main kitchen stayed as open to the family room as it was before. Serden Group managed the whole project, from the first design drawings to the final walkthrough.

01

Restructure the layout with a new load-bearing beam

The old wall arrangement couldn’t accommodate a pantry, so it was re-engineered. A new load-bearing beam now carries the structure across the opening, which freed us to frame a new wall in a better position. That one structural change is what made room for everything else on the list.

02

Add a walk-through butler’s pantry behind arched openings

The new wall created a pantry room the house never had: dark stained cabinetry against charcoal walls, a second sink with a matte black faucet, beverage drawers, floating wood shelves and a coffee station under its own windows. Arched openings frame the walkway into it, so it reads as part of the kitchen rather than a closet off it.

03

Build a floor-to-ceiling pantry wall with a hidden refrigerator

One whole side of the kitchen is now tall white shaker cabinetry with long brass pulls. A new paneled refrigerator is built into it behind matching doors, so the open-plan view from the living room is cabinetry rather than stainless. Open canister shelving, an appliance garage and deep drawers sit in the same run.

04

Upsize the range and the ventilation

A pro-style dual-fuel range replaced the old one, and a custom curved painted hood with a stainless insert replaced the narrow hood that couldn’t keep up. The hood is the visual anchor of the room as well as the working one, and the full-height quartz backsplash runs up behind it.

05

Hide storage everywhere it fits

Custom organizers went into the cabinets: pull-out spice storage and tray dividers beside the range, deep drawer stacks in place of door boxes, and a microwave drawer built into the stained wood island so the microwave sits low and out of the sight line.

06

Light the cabinets, not just the ceiling

Under-cabinet lighting runs along the counters for prep, the glass-front uppers are lit from inside, and above-cabinet lighting adds an evening glow. New brass-and-glass pendants hang over the island. In the evening the kitchen reads as warm and layered rather than lit from overhead alone.

Challenges & Solutions

The two problems that took the most care

Every kitchen of this scope has a couple of moments where precision matters more than speed. On this project there were two, and both are now invisible — which is the point.

01

A full-height quartz backsplash cut around a custom hood

The backsplash behind the range isn’t tile — it is one huge sheet of quartz, cut to wrap tight around the new custom hood. There is no grout line to hide a mistake, so the template and the cuts had to be precise to the eighth of an inch. The finished piece was big and heavy enough that it took four people to carry it in and set it safely. Across the countertops, island and backsplash, the kitchen used six large quartz slabs.

02

Matching a 20-year-old floor stain

The homeowners wanted to keep their existing hardwood floors, which kept the kitchen continuous with the rest of the house and saved replacing a floor that was still sound. But where walls and cabinets moved, the floor had to be repaired, and the original stain had aged for about 20 years. No off-the-shelf color matches a finish like that. After rounds of trial-and-error samples we arrived at an exact match, and the repaired areas now disappear into the original floor.

Scope of Work

Everything that changed

This was a design-build project: Serden Group managed everything from design to finish. Our in-house crew handled demolition, framing, cabinet installation and finish carpentry, supported by licensed, vetted trade partners on the plumbing, electrical and mechanical scopes and the quartz fabrication. One project manager coordinated the schedule, the inspections and every trade from the first walkthrough to the final punch list.

  • Kitchen design and new layout drawings
  • Demolition of the original cabinets, counters, backsplash and appliances
  • Layout restructured with a new load-bearing beam
  • New wall framed for the walk-through butler’s pantry
  • Arched openings built into the new pantry walkway
  • Plumbing relocated to the new layout, plus a second sink in the pantry bar
  • Electrical relocated and expanded for the new layout and appliances
  • Mechanical (HVAC) runs relocated to suit the new walls
  • New custom cabinetry, with hidden storage and custom organizers
  • Quartz countertops and full-height quartz backsplash — six slabs
  • New paneled, hidden refrigerator and an ice maker
  • Larger pro-style range and a custom range hood with a larger exhaust fan
  • Under-cabinet, in-cabinet and above-cabinet lighting
  • Existing hardwood floors retained, repaired and stain-matched
  • Permits, inspections, punch list and final walkthrough
The new walk-through butler’s pantry seen through an arched opening from the quartz island, with dark stained cabinets, a black faucet and charcoal walls
Materials & Finishes

What went into the kitchen

A classic white kitchen can look flat if every surface is the same. This one is layered: white cabinetry and quartz for brightness, stained wood for warmth, brass for detail, and a darker pantry room for contrast.

Perimeter & pantry wall
Custom white shaker cabinetry in the color the homeowners already loved, run floor to ceiling, with glass-front uppers lit from inside. Long brass bar pulls and knobs throughout.
Island
A stained wood island with deep drawer stacks, a built-in microwave drawer and seating along one side — the warm wood accent that keeps the white kitchen from reading cold.
Countertops & backsplash
Quartz on every counter and a full-height quartz slab backsplash with soft marble-look veining. Six large slabs in total, with the range-wall piece cut in one sheet around the custom hood.
Cooking & ventilation
A pro-style stainless dual-fuel range under a custom curved painted hood with a stainless insert and a larger exhaust fan than the original.
Refrigeration
A paneled, hidden refrigerator built into the tall cabinet wall behind matching shaker doors, plus an ice maker.
Butler’s pantry
Dark stained cabinetry against charcoal walls, a second sink with a matte black faucet, stainless beverage drawers, floating wood shelves and a coffee station, reached through arched openings.
Lighting
Under-cabinet task lighting, in-cabinet lighting in the glass-front uppers, above-cabinet lighting and new brass-and-glass pendants over the island.
Floors
The original hardwood floors, kept and repaired, with a custom stain matched to the 20-year-old finish.
Project Timeline

About three months, phase by phase

Structural work sets the pace on a kitchen like this. The beam and the new wall have to be built and inspected before rough-in can finish, and quartz can only be templated once the cabinets are installed. This is roughly how the three months broke down.

Phase 1

Design and ordering

Layout drawings, cabinet design, appliance selection (the paneled refrigerator and range dictate cabinet dimensions) and permits. Custom cabinetry is ordered early so shop time runs alongside construction.

Phase 2

Demolition and structure

Protect the house, remove the old cabinets, counters, backsplash and appliances, then install the new load-bearing beam, frame the new pantry wall and form the arched openings. Structural inspection.

Phase 3

Plumbing, electrical and mechanical rough-in

Supply and drain lines moved for the new layout and the pantry sink, circuits run for the range, hood, refrigerator, ice maker and every layer of cabinet lighting, and HVAC runs relocated. Rough inspections signed off.

Phase 4

Drywall, floor repair and stain match

Walls closed, arches finished and the room painted. The hardwood is patched where walls and cabinets moved, and stain samples are tested until the new finish matches the old.

Phase 5

Cabinets, quartz and backsplash

Cabinetry and the pantry wall installed and leveled, hidden organizers fitted, then six slabs of quartz templated, fabricated and set — including the full-height backsplash piece cut around the hood.

Phase 6

Appliances, lighting and walkthrough

Range, hood, refrigerator panels and ice maker installed, lighting and hardware finished, final inspection, punch list and a walkthrough with the Walden family.

Common Questions

About a project like this

This Felida kitchen came in at $130,000–$170,000 all-in. That covers design, demolition, a new load-bearing beam and a new pantry wall with arched openings, relocated plumbing, electrical and HVAC, custom cabinetry with built-in organizers, six slabs of quartz for the countertops and full-height backsplash, a paneled refrigerator, an ice maker, a pro-style dual-fuel range with a custom hood, a second sink in the pantry, in-cabinet, under-cabinet and above-cabinet lighting, and matching the existing hardwood floors. Kitchen remodels around Vancouver more broadly run from roughly $30,000 for a cabinet-and-counters refresh to $150,000+ when walls, beams and appliances move. Structural work, custom cabinetry and stone are the line items that push a kitchen into the upper range.
This project took about three months from start to final walkthrough. Structural work adds time compared with a kitchen that keeps its walls: the beam and new pantry wall have to be framed and inspected before mechanical, plumbing and electrical rough-in can be finished, and drywall cannot close until those inspections pass. Quartz then has to be templated off the installed cabinets, and a full-height slab backsplash cut around a custom hood adds its own templating step. A kitchen remodel that keeps the existing layout typically runs six to ten weeks; one that moves walls and adds a room like a butler’s pantry is closer to three months.
Yes, but it has to be engineered and permitted. In this kitchen the wall layout was restructured to create the walk-through pantry, which meant carrying the load on a new beam sized for the span before the new wall and arched openings were framed. The beam size, the posts that carry it and the footing beneath those posts are specified for the house, inspected, and only then covered up. Done properly it is routine; done without engineering it is one of the few remodeling shortcuts that can put a house at real risk.
For a family that cooks and entertains, usually yes. A butler’s pantry takes the coffee station, the small appliances, the bar sink, beverage drawers and bulk storage out of the main kitchen, so the main counters stay clear and two people can work without crossing paths. This kitchen had no pantry at all before the remodel, and running out of cabinet space was the homeowners’ biggest complaint. Adding a walk-through pantry with its own sink and storage solved both at once, and the arched openings let it read as part of the kitchen rather than a closet.
A full-height quartz slab backsplash has no grout lines to stain or seal, wipes clean in one pass, and continues the countertop pattern straight up the wall, which is why it suits a range wall that sees grease and steam. The trade-off is fabrication: a slab backsplash has to be templated and cut in large pieces, and every outlet, window return and hood edge must be cut precisely in the shop. In this kitchen one backsplash piece was cut to fit tight around the custom hood and took four people to carry in and set. Tile is cheaper and more forgiving to install; slab is cleaner and lower-maintenance once it is in.
Yes, with patience. When walls and cabinets move, the floor underneath has to be patched, and the patch has to match boards that have aged for years. This kitchen kept its original hardwood floors, but the stain on them was about 20 years old, and no stock color matches a finish that has aged that long. We built up test samples by trial and error until the color matched, then finished the repaired areas to blend with the rest of the floor. Keeping existing floors saves money and keeps the kitchen continuous with the rest of the house, as long as the stain match is done properly.
A paneled refrigerator is a built-in unit whose doors take cabinet panels made to match the surrounding cabinetry, so it reads as part of the cabinet wall rather than as a stainless appliance. In this kitchen the new refrigerator sits flush in the tall wall of white pantry cabinets with the same shaker doors and brass pulls, which keeps the open-plan view from the living room calm. Paneled refrigerators cost more than freestanding models and need cabinetry built to the exact appliance specification, so the appliance has to be chosen before the cabinets are drawn.
A good kitchen lighting plan has layers. Recessed lights give general light, pendants light the island, under-cabinet lighting lights the counters where you actually prep, and in-cabinet or above-cabinet lighting adds a softer glow that makes the room feel finished in the evening. This kitchen got all four: under-cabinet task lighting along the perimeter, lights inside the glass-front upper cabinets, above-cabinet lighting, and new pendants over the island. Planning the lighting before the cabinets are built matters, because the wiring for in-cabinet and under-cabinet lights runs through the cabinet boxes.

Want a kitchen like this in your home?

All Rights Reserved © Serden Group 2026 · Privacy Policy · Terms & Conditions

Get a Free Estimate Call Now