It's & We're Always Open!
BBB Accredited Business Rated 5/5 by 125+ Customers

Vancouver, WA & Portland
ADU Builders

An ADU is not a big remodel — it is a second house on your lot, with its own kitchen, its own bathroom, its own address and its own set of utilities. Serden Group runs the whole chain in-house: parcel feasibility, utility capacity, engineered plans, permits, foundation, framing, mechanicals and finishes, through to a certificate of occupancy. Detached units, attached units, garage and basement conversions across Clark County and the Portland metro.

1500+
Projects Completed
20+
Years of Excellence
100%
Full Warranty Coverage
As seen on

A second home on the lot
you already own.

The reasons people build one are remarkably consistent: a parent who should not be alone, an adult child who cannot afford a first place here, rental income against a mortgage, or a plan to eventually move into the small unit and rent the big one. What stops people is not the construction — it is the four questions that have to be answered before design starts. Does the zoning allow it on this parcel. Will the water meter and electrical service carry a second dwelling. What do the system development charges actually total. And what does the trench to the back of the lot cost. We answer all four in feasibility, in writing, before you commit to a design.

Compact kitchen built by Serden Group Cabinetry and appliance detail Countertop finish detail Interior finish detail Custom cabinetry and backsplash Cabinet hardware detail Counter styling detail Small-footprint kitchen with seating

Every ADU Type. One Crew.

Detached units, attached units, above-garage builds, and garage and basement conversions. Feasibility, design, structural engineering, permits, site work, framing, utilities and finishes — sequenced by one project manager from the first zoning check to the certificate of occupancy.

Garage conversion accessory dwelling unit

Detached
ADUs

A standalone unit in the back or side yard on its own foundation — kitchen, full bath, bedroom, and its own entry and address.

Attached accessory dwelling unit under construction

Attached
ADUs

Built off the existing house on a new footing line, with a separate exterior door and a code-compliant separation wall.

Open-concept living space finished by Serden Group

Garage &
Basement ADUs

Converting space you already own — insulation, egress, ceiling height, a new kitchen and bath, and a legal second address.

Addition and interior finish work by Serden Group

Above-Garage
ADUs

A second story over an attached or detached garage, with the foundation and shear capacity verified before design starts.

Everything an ADU takes —
under one contract

An ADU touches zoning, utilities, structure, energy code and every trade at once, and it ends in a certificate of occupancy rather than a walkthrough. Here is the full scope Serden Group coordinates — our own crew on the build, plus licensed, vetted trade partners for engineering, survey and specialty work.

Zoning and feasibility

Setbacks, lot coverage, height limit, maximum unit size and how many units your parcel can actually carry — checked against your zone before you spend a dollar on design.

Utility capacity check

Whether your existing water meter, electrical service and sewer lateral can carry a second dwelling, or whether the ADU needs its own — often the single biggest hidden cost.

Design and engineered plans

Floor plan, elevations, energy code compliance and stamped structural drawings for footings, beams and shear walls. Everything the jurisdiction needs in one submittal.

Permits and system charges

Building, plumbing, mechanical and electrical permits, plus the traffic, park, water and sewer impact fees a new dwelling unit triggers. We quote them as line items, not surprises.

Site work and foundation

Excavation, footings and stem walls or a slab, plus grading and any stormwater management the added impervious area requires.

Framing, roof and envelope

Wall and roof framing, sheathing, weather barrier, windows, doors, roofing, siding and trim — detailed so a new detached unit reads as part of the property, not a shed.

Separate utilities and metering

Water, sewer, power and gas runs to the unit, with sub-metering or a separate meter where the jurisdiction requires it or where you intend to rent long-term.

Kitchen, bath and finishes

A full kitchen and a full bathroom are what make it a dwelling unit. Cabinetry, counters, tile, flooring, trim, lighting and paint by the same crew that builds our primary-home remodels.

Address, inspection and occupancy

Final inspections through every trade, the new address assigned, and a certificate of occupancy in your hand — so the unit is legal to rent, insure and appraise.

How an ADU gets built —
from feasibility to certificate of occupancy.

How It Works
1
Feasibility

Before you pay for design, we measure your lot against your zone's setbacks, lot coverage and height limits, and check whether your foundation and roof can carry what you want to build. You get an honest yes, a build-up-instead recommendation, or a no — plus a realistic budget range.

Before renovation
2
Design & Permit

Floor plans, elevations and stamped structural drawings, then submittal and plan-review management with Clark County, Vancouver, Camas or Portland Permitting & Development. Every selection and every line of the schedule is approved before material is ordered.

Construction framing
3
Build & Tie-In

Footings, framing, roof tie-in, mechanicals, then finishes — with your kitchen and bathrooms kept in service and the work zone sealed and dust-controlled. One project manager, one number to call, and a punch-list walkthrough before final inspection.

Finished kitchen

With Serden Group, you get expert guidance and a stress-free home remodel — from design to final walkthrough.

20+
Years of Excellence
1500+
Projects Completed
100%
Warranty Coverage
99%
Client Satisfaction
Serden Group consultation with clients reviewing remodeling plans

Recent Serden Projects

Kitchen remodel project
Kitchen remodel project
Kitchen remodel project
Kitchen remodel project
Kitchen remodel project
Kitchen remodel project
Project 1
Project 2
Project 3
Project 4
Project 5
Project 6
Project 7
Project 1
Project 2
Project 3
Project 4
Project 5
Project 6
Project 7
Project 8
Project 9
Project 10
Project 8
Project 9
Project 10

What an ADU costs in
Vancouver & Portland

Finished ADUs in this metro generally run $250–$425 per square foot including design, engineering, permits and system development charges. Conversions sit well below that; detached units on difficult sites sit above it.

ADU type Typical size Planning range
Garage conversion ADU 350–600 sq ft $70,000 – $160,000
Basement conversion ADU 500–800 sq ft $95,000 – $185,000
Attached ADU on a new footprint 400–800 sq ft $150,000 – $290,000
Detached ADU, one bedroom 500–750 sq ft $190,000 – $330,000
Detached ADU, two bedroom 750–1,000 sq ft $240,000 – $400,000
Above-garage ADU 500–800 sq ft $220,000 – $380,000

What pushes an ADU budget up

A long utility run to the back of the lot, a sewer lateral that has to be replaced or a new tap cut in, an electrical service upgrade, sloped or rock-heavy sites, stormwater detention triggered by the added impervious area, and system development charges that vary by jurisdiction.

What brings it down

Using space you already own and already have a roof over — a garage or basement conversion avoids the foundation, the roof and most of the site work. Keeping the unit under the size threshold that triggers additional review, and stacking the ADU near the existing utility stub-outs.

What people forget to budget

Impact and system development fees, a separate water meter, the driveway or path the code requires to the entry, landscaping restoration after the trench work, and appliances. We list all of it in the written scope so the finance conversation happens once.

Get an ADU feasibility review

Conversion, attached, or
detached ADU?

All three produce a legal second dwelling. They differ enormously in cost per square foot, in what they do to your yard, and in how they appraise and rent. The right answer is usually decided by your lot, not your preference.

Garage or basement conversion

The cheapest route to a legal unit, because the foundation, walls and roof already exist. The work is insulation, egress, ceiling height, fire separation, and a new kitchen and bath.

Best when you need

  • — You have a garage or basement you barely use
  • — You want the lowest cost per square foot
  • — The yard matters more than the parking

Watch ceiling height and egress window size — both are hard limits, and both are where DIY conversions fail inspection.

Attached ADU

New square footage built off the existing house on a fresh footing line, with its own exterior entry and a code-compliant separation from the primary dwelling.

Best when you need

  • — Your lot is narrow or has tight setbacks
  • — You want short utility runs
  • — Multigenerational living, not rental income

Shares a wall and often a roofline with the house, which keeps costs and permitting simpler than a detached build.

Detached ADU

A standalone building in the rear or side yard. The most expensive per square foot and the most valuable — real privacy, its own address, and the strongest rental and resale story.

Best when you need

  • — You have rear-yard access and depth
  • — Long-term rental or resale value is the goal
  • — Full separation from the main house

Budget for the utility trench to the back of the lot and for stormwater if the new roof and path push you over the impervious threshold.

Not sure which your parcel allows? Read the ADU permit process, step by step, or compare it against a home addition if the goal is more room rather than a second unit.

WA OR

Home Additions Across
Portland & Vancouver, WA

Serden Group builds additions on both sides of the Columbia — bump-outs on Clark County's newer subdivisions, primary suites on Camas hillside lots, and second stories on Portland's older bungalows. Setbacks, lot coverage, stormwater and design review differ in every one of these jurisdictions, and we have permitted work through all of them.

Vancouver, WA Portland, OR Camas, WA Washougal, WA Battle Ground, WA Ridgefield, WA La Center, WA Felida, WA Salmon Creek, WA Beaverton, OR Tigard, OR Lake Oswego, OR
Service area map — Washington and Oregon VANCOUVER LA CENTER RIDGEFIELD FELIDA SALMON CREEK BATTLEGROUND HILLSBORO CAMAS PORTLAND WASHOUGAL BEAVERTON TIGARD CLACKAMAS LAKE OSWEGO HAPPY VALLEY WEST LINN
Completed home remodel by Denis Serden

Your ADU
Starts Here

Request your free ADU feasibility consultation

What is your budget?

Please select an option to continue.

Questions? Call (360) 836-7775

ADUs —
Common Questions

An accessory dwelling unit is a second, smaller, independent home on a lot that already has a house on it. To count as a dwelling unit it needs its own entrance, a full kitchen, a full bathroom and a place to sleep. It can be detached in the back yard, attached to the existing house, built above a garage, or converted out of a garage or basement. Legally it stays part of your parcel — you cannot sell it separately — but it gets its own address, can be rented, and is counted by appraisers as additional living area.
Garage conversions start around $70,000–$160,000 because the shell already exists. Basement conversions run $95,000–$185,000. An attached ADU on a new footprint is typically $150,000–$290,000, a one-bedroom detached unit $190,000–$330,000, and a two-bedroom detached unit of 750–1,000 sq ft $240,000–$400,000. Finished cost per square foot generally lands between $250 and $425 depending on site access, utility runs and finish level. Those figures include design, engineering, permits and system development charges.
Plan on 10 to 16 months end to end. Feasibility and design take 6–12 weeks, permit review 8–20 weeks depending on the jurisdiction and whether corrections come back, and construction 5–8 months for a detached unit or 3–5 months for a conversion. The permit queue is the part nobody controls, which is why we start the utility capacity research during design instead of waiting for plan review to raise it.
Washington's 2023 ADU law requires cities and counties inside urban growth areas to allow up to two accessory dwelling units per residential lot, to permit units of at least 1,000 square feet, to drop owner-occupancy requirements, and to waive off-street parking mandates for lots near major transit. Local implementation still varies in the details — height, setbacks, design standards and fees are set city by city. We check your specific parcel against the current adopted code before design, because "two units are allowed" and "two units fit here" are different questions.
Yes. Long-term rental is allowed for ADUs in Vancouver, Camas and Portland, and Washington law removed owner-occupancy requirements for units in urban growth areas. Short-term rental is regulated separately and differently in each city, so if nightly rental is your plan, confirm the current rules for your address before you design around them. Either way the unit needs a final inspection and a certificate of occupancy to be legally rentable and insurable.
It generally does, in two ways: appraisers count the additional finished living area, and an income-producing unit changes what a buyer is willing to pay for the parcel. It also raises your assessed value and therefore your property taxes, and it can affect your homeowner's insurance. We are contractors, not appraisers — talk to a local appraiser and your lender before you underwrite the project on an expected return.
Sometimes, and it is the most common budget surprise. The real questions are whether your existing water meter and electrical service have capacity for a second dwelling, and whether the sewer lateral can be shared or needs a new tap. A 100-amp panel usually cannot carry a second full kitchen, laundry and heat pump. We run the capacity check during feasibility, before you have paid for a design that assumes the easy answer.
Yes, if it hits four marks: minimum ceiling height, a compliant egress window or door in the sleeping room, insulation and air sealing that meet current energy code, and fire separation from any remaining garage space or from the primary dwelling. Slab elevation and slope also matter — garage slabs are usually pitched to the door and often need a new floor system. A conversion that skips these is not a legal unit, which surfaces at appraisal or at sale.
We handle it. Serden Group is a design-build contractor, so feasibility, design, structural engineering, energy code compliance, submittal, plan-review corrections and inspections all run through one team with one project manager. If you already have an architect or a set of plans, we are glad to build from them — we will just review them for constructability and cost before you commit.

Articles & Insights

Blog posts will appear here.

Our Work

Full project gallery will appear here.

All Rights Reserved © Serden Group 2026 · Privacy Policy · Terms & Conditions

Built by synertech
Get a Free Estimate Call Now