The Quick Answer

Yes, if you’re moving a shower drain, adding an outlet or taking out a bathroom wall inside Vancouver city limits. Painting the room or replacing the vanity cabinet while keeping the plumbing and wiring unchanged is generally exempt. Even when everything stays in the same spot, installing a new fixture can change the answer.

Vancouver permit rules · Residential building permits

A remodeler reviews a bathroom floor plan beside a tub with the shower valve and supply pipes exposed.
Planning illustration. The shower valve behind the tub wall is one detail to include in a permit inquiry.

Is your home in Vancouver or unincorporated Clark County?

Look up your street address in the Clark County Property Information Center. Open “Administrative Data” and read the “Jurisdiction” field. A Vancouver mailing address can fall outside city limits.

If the field says Vancouver, use the city rules below. If it says Clark County, the county requires a plumbing permit to install any plumbing fixture, including a sink or toilet. Washington Labor & Industries (L&I) handles electrical permits in unincorporated Clark County. If another city appears, start with that city’s permit office.

Look up your jurisdiction · Clark County residential permits · Washington electrical permits

Which bathroom upgrades need a permit?

These examples apply to an existing single-family home inside Vancouver city limits. List each part of the job. A cabinet, sink and outlet bought together can have three different permit answers.

What you’re changingWhat to plan for in the City of Vancouver
Paint or wallpaperExempt finish work.
Vanity cabinet onlyExempt when you can replace the cabinet without changing the wiring or plumbing.
Temporarily remove the toiletYou can lift and reset the same toilet if the work involves no new or relocated valves, pipes or fixtures.
Install a new toilet or vanity sinkA new fixture falls outside the exemption for resetting the original one. Confirm the plumbing permit for your replacement before ordering.
Move a drain or replace the shower valvePlan for plumbing approval, even if the new shower fits the old alcove.
Add an outlet or electric floor heatPlan for electrical approval for the new wiring. Identify the outlet or heating system when describing the work.
Add a bath fan and a new exhaust ductPlan for mechanical approval for the exhaust and electrical approval for new wiring. For a motor-only repair, describe the parts to the city.
Remove an interior wallA residential building permit applies. Vancouver lists wall removal as a trigger, including an interior partition.

City permit exemptions · Electrical permit rules · Residential remodel requirements

Does a tub-to-shower conversion need a permit?

Plan for a plumbing permit when you replace a bathtub with a walk-in shower. The shower base, drain connection and valve are the details to describe. A curbless design that changes floor framing can bring building review into the project, too.

Vancouver’s public records show how the city handled one such job. On February 24, 2026, it issued plumbing permit MPE-384700 for a first-floor tub-to-shower conversion. That day it also issued MPE-384696 for a shower replacement.

City permit report, page 48 · Serden’s tub-to-shower conversion guide

How to get a bathroom remodel permit in Vancouver

Start with a description the Permit Center can use

Tell the city what stays, what comes out and what will move. For a remodel application, Vancouver’s checklist calls for plans of the existing room and the proposed layout. Show the fixtures, exhaust fan and door swing. If you’re removing a wall, mark it on both drawings.

For example, you could email this before demolition: “We’re keeping our toilet and vanity. We plan to replace the tub with a shower, move the drain and install a fan with a new duct. The walls will stay in place. Our address is ____. Which permit should we apply for, and what needs inspection before we close the walls?”

Residential remodel checklist · City permit questions

Find out whether the work fits under one permit

Vancouver uses a residential building permit (RES) for remodels that include building work. Plumbing, electrical and mechanical work in that remodel are generally covered together. The electrician still obtains an electrical permit of record. A standalone plumbing, electrical or mechanical job can use the city’s trade permit (MPE).

City application and trade permit guidance

How much does a bathroom remodel permit cost?

A shower-only job and a room expansion are priced differently. In its 2026 plumbing schedule, Vancouver lists $15.14 for a tub, shower or shower pan and a $78.99 minimum for a typical standalone plumbing permit. A single shower pan therefore reaches the minimum even though its individual fee is lower.

For a remodel involving building work and multiple trades, the city calculates fees from the value of labor and materials and lists a separate plan-review charge. Ask your contractor to show which permit fees are included in the estimate and whether any are allowances.

2026 plumbing fee schedule, Table IV · Residential building and plan-review fees

When can the shower walls be closed?

After the required inspection for that stage has passed. Vancouver requires permitted work to stay visible and accessible until approved. Ask your contractor which inspection comes before the shower backer board or tile, and who will schedule it. At the end of the job, keep the permit number and final approval with your home records.

Vancouver inspection rules · Schedule a city inspection

A Vancouver-area bathroom remodel in practice

At our Lake Shore Jack-and-Jill remodel, the homeowners wanted more room at the vanity. We removed the partition dividing the bathroom, brought the plumbing for two sinks onto one wall, added vanity lighting and replaced the tub with a walk-in shower. The old and new rooms occupied the same space.

If you’re planning something similar, write down those four changes before asking for a permit estimate. “New double vanity” alone would leave out the wall removal, new wiring and shower drain. The before-and-after photos show where the partition stood and how the two sinks fit along the reclaimed wall.

See the Lake Shore bathroom project and photos

More bathroom permit questions

Do I need a permit just to retile the shower?

Tell the Permit Center what comes off with the tile. Surface work on an existing wall and rebuilding the shower floor around a new drain are different scopes. Vancouver’s exemption names painting, wallpaper and similar finishes. For tile work involving the pan, waterproofing or substrate, describe those layers and ask which inspections apply before covering them.

City exemptions for finish and plumbing work

Who pulls the permit if I hire a contractor?

Have the proposal name who will apply, pay the fees, schedule inspections and give you the final record. If you hire an electrical contractor, that contractor obtains the electrical permit for their work. In Vancouver, an electrician working under a residential building permit also needs the city’s permit of record.

Washington L&I permit guidance · City electrical permit of record

What if I discover the last owner remodeled without a permit?

For a home inside Vancouver, contact the city before covering or altering the existing work. Vancouver offers a field evaluation permit so inspectors can assess the work and identify which permits or repairs are needed.

City field evaluation permit

Planning a bathroom remodel in Vancouver?

Bring your fixture list to a free walkthrough with Serden Group. We’ll look at the wall you want to open, where the new fixtures will connect and which permit items belong in your estimate.

Request a free bathroom walkthrough · Bathroom remodeling in Vancouver, WA