Yes, if your bathroom remodel moves a toilet, alters concealed plumbing, adds an electrical circuit, or changes wall framing. A tub-to-shower conversion typically needs plumbing approval, even when the shower fits in the old tub’s footprint. If you’re replacing a sink in the same spot, confirm the permit requirement with the office that serves your property before work starts.
- Paint
- A new mirror or hardware
- A vanity cabinet, with the existing sink and plumbing left in place
- Moving a toilet
- Altering concealed plumbing, including a tub-to-shower conversion
- Adding an electrical circuit
- Changing wall framing
SourcesPortland residential permit guide · Vancouver residential building permits
Bathroom remodel permit checklist for Portland and Vancouver
Use this checklist for an existing bathroom in a typical site-built single-family home. Start with the overview to see which kinds of approval each change brings in, then read the city-by-city detail below it.
| What you’re changing | Plumbing | Electrical | Mechanical | Building |
|---|---|---|---|---|
| Vanity cabinet only | Not typically | Not typically | Not typically | Not typically |
| New sink in the same spot | Confirm with your office | Not typically | Not typically | Not typically |
| Tub-to-shower conversion | Plan on it | Not typically | Not typically | If walls or floor framing change |
| Moving a toilet | Plan on it | Not typically | Not typically | If the route affects joists or framing |
| Adding a fan circuit | Not typically | Plan on it | If ducting is new or altered | Not typically |
| Adding, moving or removing walls | If plumbing is affected | If wiring is affected | If ductwork is affected | Plan on it |
The detail below applies inside each city’s limits. If your mailing address says Vancouver and your parcel is in unincorporated Clark County, use the county and state links in the next sections.
| What you’re changing | Portland, OR city limits | Vancouver, WA city limits |
|---|---|---|
| Vanity swap | Cabinet only Generally no permit if the sink and plumbing stay untouched. New sink, same spot Portland’s residential plumbing and trade guides say to get a plumbing permit for fixture replacements. Ask Portland Permitting & Development how it treats a swap with all connections exposed. |
Cabinet only Generally no permit if the sink and plumbing stay untouched. Replacing or reconnecting a sink Describe the work to the Permit Center and confirm whether a plumbing permit is required. Rerouting pipes Plan on plumbing approval. |
| Tub-to-shower conversion | Plumbing permit A new shower fixture, drain changes, or a new concealed valve are plumbing work. Ask whether a shower pan test is required. Add building review if you modify walls or floor framing. |
Plan on plumbing approval Tell the city whether the drain, trap, valve, or floor framing will change. Ask whether your scope can go through a standalone trade permit or needs a residential remodel permit. |
| Moving a toilet | Plumbing permit Relocating the toilet and changing its drain, vent, or supply requires plumbing approval. Ask about building review if the route affects joists or wall framing. |
Plumbing approval Give the city the old and proposed toilet locations and flag any framing work. The permitting route depends on whether the work is standalone or part of a larger remodel. |
| Adding a bathroom fan circuit | Electrical permit Required for the new circuit. If the project also adds or reroutes exhaust ducting or creates a new exterior vent, confirm mechanical permit and inspection requirements. |
City electrical permit Required for the new circuit. Ask about mechanical approval for new or altered exhaust ducting. Vancouver requires an electrical permit of record for electricians working under a residential building permit. |
| Adding, moving, or removing walls | Building permit Show the existing and proposed layout. Flag any load-bearing wall and any plumbing, wiring, or ductwork affected by the change. |
Residential building permit Plan on one. Bring existing and proposed plans and identify any load-bearing walls. Ask how related plumbing, mechanical, and electrical work goes on record. |
SourcesPortland plumbing permits · Portland trade permits · Portland mechanical permits · Vancouver remodel checklist
Why a same-location vanity swap deserves a closer look
“Vanity swap” can mean three different scopes:
For Portland, the city’s dedicated plumbing and trade pages list replacing fixtures, including replacements in the same location, as permitted work. Its general residential page mentions concealed connections when discussing replacement fixtures, while Oregon’s statewide overview lists certain ordinary fixture replacements as exempt. For a Portland address, ask the city directly how it applies its guidance to your exact scope. In unincorporated Clark County, the county’s published guidance calls for a plumbing permit to install fixtures such as sinks and toilets, so check with the county before treating a fixture swap as exempt.
SourcesPortland residential plumbing permits · Portland home project permit guide · Oregon Building Codes Division · Clark County residential permits
How to check your permit jurisdiction by address
A city name on your mail can cover properties outside city limits. Use the parcel’s jurisdiction field, then give the permit office your street address and parcel number when you call.
- Look up the property. Search your full street address in PortlandMaps and select the correct property.
- Read the Jurisdiction field in the property information.
- Contact the office that serves the parcel. If it says Portland, contact Portland Permitting & Development at 503-823-7300. If the parcel is outside city limits, follow the jurisdiction shown or find the correct department in Oregon’s Local Building Department Directory.
- Look up the property. Open the Clark County Property Information Center from the City of Vancouver property lookup page and search by street address or tax account.
- Read Administrative Data → Jurisdiction.
- Contact the office that serves the parcel. If it says Vancouver, use the City of Vancouver Permit Center. If it says Clark County, use Clark County Community Development for building, plumbing, and mechanical permit questions and Washington L&I for electrical. If another city is listed, contact that city and check who issues its electrical permits.
SourcesPortlandMaps jurisdiction instructions · Vancouver property lookup instructions · Washington L&I’s city electrical directory
What to ask the permit office before demolition
Send a few current photos and a simple before-and-after sketch. Mark the fixtures that move, any wall framing that changes, and whether the exhaust fan gets a new circuit or duct. For a cabinet-and-sink swap, say whether you’re reconnecting the same sink or installing a new one and whether any connections are concealed.
“I’m remodeling an existing bathroom at [street address and parcel number]. We’re replacing the tub with a shower in the same alcove, moving the drain, and adding a new circuit and exterior duct for the exhaust fan. The walls will stay in place. Which permits cover this work, what drawings do you need, and what inspections should we schedule before closing the walls or tiling?”
Ask who will pull each permit, which fees are included in your estimate, and who will schedule inspections and confirm final approval. Build any required rough-in inspections into the schedule while the work is still accessible. Portland, for example, calls for a rough plumbing inspection before piping is covered and a final inspection after fixtures are installed.
- Permit issuedBefore demolition and rough-in work starts.
- Rough-in inspectionWhile new piping and wiring are still exposed.
- Walls closed, tile setOnly after the rough-in passes.
- Final inspectionAfter the fixtures are installed.
ExampleA typical sequence based on Portland’s plumbing inspections. Ask your office which inspections apply to your scope.
SourcesPortland plumbing inspections · Vancouver residential building and trade permits
Converting a tub to a shower? Our tub-to-shower conversion guide covers the scope and cost, and our Vancouver bathroom remodel permit guide goes deeper on Clark County.
Frequently asked questions
Do I need a permit to retile or paint my bathroom?
Painting and finish-only tile work generally don’t require a permit. If your tile project includes rebuilding a shower pan, changing the drain, or opening and altering wall or floor framing, describe the full scope to your permit office.
SourcesOregon residential permit overview · Clark County residential permits
Do I need a building permit if I already have a plumbing permit?
It depends on the scope. A standalone plumbing alteration may only need trade approval. Moving a wall or altering floor framing can bring in building review as well. In Vancouver, the city’s permit office can tell you which trade work goes under a residential remodel permit and which work needs a separate permit of record.
SourcesPortland residential permit guide · Vancouver residential building permits
Can I use Portland’s Simple Bathroom Permit program?
Portland describes the program as a streamlined path for eligible projects that add or legalize a bathroom inside an existing home. For an update to an existing legal bathroom, ask Portland Permitting & Development whether the scope calls for trade permits, a standard remodel permit, or both.
Planning a bathroom remodel with Serden Group?
Send us your property address, a few photos, and a list of what you’d like to change. We’ll walk through your options and explain how permitting and inspections fit into the proposed scope.
Call (360) 836-7775 or book online to schedule your free consultation.
Request a free bathroom remodeling consultation · Read our bathroom remodel cost guide




