Real 2026 price ranges for kitchens, bathrooms, whole-home remodels and ADUs in Clark County and the Portland metro, with typical timelines and what every Serden Group price includes. Updated November 2026.
In 2026, most kitchen remodels in Vancouver, WA and Portland, OR cost $20,000–$160,000+ and take 4–8 weeks of construction. Bathroom remodels run $8,000–$120,000+ over 1–16 weeks, whole-home remodels $150,000–$400,000+ over 2–6+ months, and ADUs $70,000–$400,000 over 10–16 months including permits. Every Serden Group project includes a one-year workmanship warranty, with five-year coverage available.
Planning ranges for the Vancouver, WA and Portland, OR metro. They come from the budgets in our own published cost guides and the projects we build, and they include labor, materials, permits and project management.
| Project | Typical cost | Typical timeline | Detailed guide |
|---|---|---|---|
| Kitchen remodel | $20,000–$160,000+ | 4–8 weeks of construction | Vancouver kitchen costs · Portland |
| Bathroom remodel | $8,000–$120,000+ | 1–16 weeks, by scope | Vancouver bath costs · Portland |
| Tub-to-shower conversion | $9,200–$20,700+ | 1–3 weeks | Tub-to-shower guide |
| Whole-home remodel | $150,000–$400,000+ | 2–6+ months | Home renovation budgets |
| ADU (garage conversion to detached) | $70,000–$400,000 | 10–16 months incl. design & permits | ADU costs & process |
Ranges are for planning, not quotes. Your written estimate comes after a site visit. Tub-to-shower timeline is a typical in-footprint conversion.
The jump between tiers is almost always cabinetry and layout. Keeping sound cabinet boxes and the existing plumbing and gas locations keeps a kitchen in the lower tiers; moving walls or utilities and ordering custom cabinets moves it up. Try the kitchen budget calculator for a number based on your own selections.
| Tier | Typical scope | Cost |
|---|---|---|
| Cosmetic refresh | Surface updates, no layout changes | $20,000–$35,000 |
| Mid-range remodel | New cabinets, counters, backsplash, lighting, some appliances | $45,000–$75,000 |
| Full custom kitchen | Custom cabinetry, premium finishes, upgraded layout | $75,000–$110,000 |
| Luxury kitchen | Custom everything, premium appliances, structural changes | $110,000–$160,000+ |
| Tier | Typical scope | Cost |
|---|---|---|
| Refresh | Keep cabinet boxes; update doors or paint, counters, backsplash, fixtures | $20,000–$35,000 |
| Midrange | Replace cabinetry, counters and flooring; update lighting and hookups | $35,000–$65,000 |
| Custom | New layout, relocated utilities or made-to-fit cabinets | $65,000+ |
Tile area, the shower system and whether the drain or toilet moves drive most of the difference. A tub-to-shower swap in the same footprint is the most common mid-budget project we build. Try the bathroom budget calculator.
| Tier | Typical scope | Cost | Timeline |
|---|---|---|---|
| Cosmetic refresh | Fixtures, paint, vanity, lighting | $8,000–$18,000 | 1–2 weeks |
| Mid-range remodel | New tile, tub/shower, vanity, flooring | $20,000–$45,000 | 3–5 weeks |
| Full gut remodel | Complete demo, layout changes, premium finishes | $45,000–$75,000 | 6–10 weeks |
| Luxury primary suite | High-end materials, custom tile, heated floors | $75,000–$120,000+ | 10–16 weeks |
| Scope | Cost |
|---|---|
| Tub to prefab shower, same footprint | $9,200–$20,700 |
| Tub to custom tiled shower | $13,800–$20,700+ |
| Full hall bath, standard cabinetry and fixtures | $23,000–$36,800 |
| Primary suite, custom cabinetry, premium tile or quartz | $66,700–$112,700 |
| Scope | What changes | Cost |
|---|---|---|
| 4×6 powder room refresh | Vanity, toilet, flooring, light and paint; supply and drain locations stay | $8,000–$12,000 |
| 5×8 hall bath, same layout | New tub, tiled surround, floor and fixtures; main plumbing locations stay | $16,000–$30,000 |
| 5×8 full gut, plumbing moved | Tiled shower with a new drain, relocated toilet and vanity | $28,000–$48,000+ |
Floor plans and itemized examples: small bathroom remodel cost.
Combining rooms in one project shares the setup, permitting and project management, which is why a combined kitchen and bath often costs less than doing them two years apart. See our whole-home remodeling service.
| Tier | Typical cost | What’s usually included | Timeline |
|---|---|---|---|
| Small renovation | $15,000–$40,000 | Bathroom refresh, cosmetic kitchen update, flooring, interior paint, minor lighting | 2–6 weeks |
| Medium renovation | $50,000–$150,000 | Full kitchen or bathroom remodel, multi-room updates, some plumbing/electrical relocation | 4–8 weeks |
| Full-home renovation | $150,000–$400,000+ | Kitchen and baths together, structural changes, whole-home flooring, panel and plumbing updates, windows and doors | 2–6+ months |
Finished cost generally lands between $250 and $425 per square foot depending on site access, foundation, utility runs and finishes. Utility capacity (water meter, electrical service, sewer lateral) is the most common budget surprise, so we check it during feasibility. Read the full ADU guide or garage conversion costs.
| ADU type | Typical cost |
|---|---|
| Garage conversion | $70,000–$160,000 |
| Basement conversion | $95,000–$185,000 |
| Attached ADU, new footprint | $150,000–$290,000 |
| Detached ADU, one bedroom | $190,000–$330,000 |
| Detached ADU, two bedrooms (750–1,000 sq ft) | $240,000–$400,000 |
Before you compare quotes, check that each contractor is licensed in your state and that the warranty is in writing. You can verify ours yourself on the state sites below.
Our in-house crew is supported by licensed, vetted trade partners for specialty work, coordinated by one project manager from design to final walkthrough. Want to compare contractors side by side? Read how to choose a remodeling contractor in Vancouver, WA.