Plan on 4–8 weeks of construction for a typical full kitchen remodel that keeps the existing layout. These are planning ranges from the start of on-site work. Design, material ordering and permit review can add weeks or months before demolition, and some of that work can happen at the same time.
- 1–3 weeksCosmetic refresh
- 4–8 weeksFull remodel, same layout
- 8–12+ weeksLayout change or structural remodel
The date most homeowners care about is when they can cook dinner in their own kitchen again. Ask for two dates in your schedule. Those milestones may fall in different weeks.
Kitchen remodel timeline by project scope
| Project scope | On-site planning range | What can change the schedule |
|---|---|---|
| Cosmetic refresh | 1–3 weeks | The condition of existing cabinets and walls, the extent of paint or backsplash work, and material availability. |
| Full kitchen remodel, same layout | 4–8 weeks | Cabinet installation, countertop fabrication, flooring, and trade coordination. This is the range Serden Group uses as a starting point for many kitchen projects. |
| Layout change or structural remodel | 8–12+ weeks | Framing, utility relocation, rough-in inspections and repairs discovered during demolition. Engineering and plan review can also extend the time before construction. |
Use these ranges for early planning. A large kitchen, a custom cabinet package or an entire first-floor renovation can need a different schedule. For a closer look at what goes into each scope, see Serden Group’s kitchen remodeling services. If you are weighing scopes by budget as well as time, the kitchen remodel budget calculator gives a ballpark for each.
How long does planning take before demolition?
Start by deciding which parts of the room will stay in place. Keeping the sink, range and walls where they are usually makes the schedule easier to predict. Moving an island with a sink means planning a new drain route, water lines and electrical work. In a home with a slab foundation, the drain route may change how much flooring needs to come up and how much concrete work is involved.
Finalize the cabinet drawings and select your appliances together. The exact refrigerator model affects panel sizes, door swing and clearance. The range and hood affect cabinet spacing, duct routing and utility connections. Give the countertop fabricator the sink and cooktop specifications so cutouts can be planned before fabrication.
Ask your contractor to show three things on the preconstruction schedule:
- The date drawings, finishes and model numbers need homeowner approval.
- The expected cabinet delivery date and who will check for missing or damaged parts.
- Any permit approvals, material deliveries and trade bookings that need to be in place before demolition.
You can use a holiday or move-in date to work backward, but start from the date you need a usable kitchen. Then leave room for inspection scheduling, delivery changes or repairs that only become visible after the room is opened up. Still at the very beginning? Read where to start with a kitchen remodel.
A six-week kitchen remodel schedule, from demolition to walkthrough
Here’s an example for a same-layout remodel with new cabinets, stone counters, flooring, a tile backsplash and appliance connections. It assumes design decisions are complete, materials are available, and any necessary approvals are in place before work begins. Your contractor may sequence flooring, paint and trim differently depending on the products and installation details.
| Week | Work scheduled | Milestone for the homeowner |
|---|---|---|
| Week 1 | Protect adjacent rooms, disconnect fixtures, remove cabinets and counters, and inspect exposed walls and subfloor. | The crew confirms whether any hidden damage or repairs affect the schedule. |
| Week 2 | Complete plumbing, electrical and ventilation rough-ins as applicable. Schedule required inspections and prepare walls and floors. | Work that will be covered is ready for inspection where required. |
| Week 3 | Install and level the cabinets. Confirm appliance openings, sink details and countertop edges, then template the counters. | Countertop measurements are complete and fabrication can begin. |
| Week 4 | Fabricate countertops off-site. Complete compatible paint, trim, flooring or punch work where access allows. | The countertop installation date is confirmed. The main sink is usually still unavailable. |
| Week 5 | Install countertops and coordinate sink, appliance and fixture connections. Set tile backsplash and finish electrical trim as sequencing allows. | The team can give a more precise date for using the sink and cooking appliances. |
| Week 6 | Finish remaining connections, complete applicable final inspections and walk through the project. | Confirm kitchen use, note touch-ups and agree on dates for any remaining items. |
Why cabinets and countertops often determine the finish date
Cabinets can affect both the demolition date and the countertop installation date. A missing sink base or island cabinet can hold up the template, even if the rest of the kitchen is ready. If you choose custom cabinetry, ask for the lead time on your specific door style and finish before committing to a start date. For stock or ready-to-assemble cabinets, verify the entire order, including panels, fillers and trim.
Quartz and stone countertops are generally measured after the base cabinets are installed, leveled and secured. That is the stage in the photo above. The fabricator measures the actual space, then cuts the slabs to fit. A kitchen can look almost finished during fabrication even though counter installation, sink hookup and some finish work are still ahead. Get the template date, expected installation date and plumbing return visit on the same schedule so you can see how they connect.
Do kitchen remodel permits affect the timeline in Vancouver and Portland?
First, confirm the jurisdiction for your project address. A Vancouver mailing address can be outside city limits, and Portland-area suburbs can have different permit offices. Give the permit office the actual scope, including any wall, wiring, plumbing or ventilation changes.
| Project address | Where to check | What to confirm |
|---|---|---|
| Inside Vancouver, WA city limits | City of Vancouver residential building permits | Whether your scope requires a residential remodel permit and which trade permits and inspections apply. |
| Unincorporated Clark County, WA | Clark County residential permits | Which application applies to the address and work, and whether plans or supporting documents are needed. |
| Inside Portland, OR city limits | Portland residential permit guidance | Portland lists cabinet and countertop installation among examples that can be exempt from a building permit. Wall changes and trade work have separate requirements, so verify the full scope. |
Permit review and inspections affect different parts of the schedule. Review can affect when permitted work starts. Once construction is underway, required rough-in inspections can affect when walls close, and finals can affect when the project is signed off. Ask which inspections apply and where they sit on your project schedule.
For a job-by-job breakdown, see our kitchen remodel permit checklist for Portland and Vancouver.
How to prevent common kitchen remodel delays
- Approve appliances before cabinet drawings are finalized. Exact model numbers let the cabinet designer account for openings, panels, clearances and hookups.
- Check deliveries before removing the old kitchen. Ask which items must be delivered and inspected before demo and which can arrive later without delaying the next trade.
- Confirm what happens if demolition uncovers damage. Ask who documents a leak, soft subfloor or old wiring, who prices the repair, and how quickly you’ll need to approve a change.
- Coordinate the countertop and plumbing dates. A countertop installation date alone won’t tell you when the kitchen sink comes back. Confirm when the plumber returns and whether any curing time affects the handoff.
- Get one schedule that the trades share. Look for dates or windows for delivery, rough-ins, inspections, cabinet installation, templating, appliance hookup and walkthrough.
Can you live at home during a kitchen remodel?
Many homeowners stay home during a kitchen remodel. Before demo, choose a temporary meal-prep spot outside the work area, identify an alternate source of water and move essentials out of the kitchen. Ask which days might involve water shutoffs, heavy dust, noise or limited access through neighboring rooms. If the kitchen connects the garage, laundry room or only practical entrance, agree on an alternate route with your contractor.
Frequently asked questions
Can a full kitchen remodel be done in two weeks?
Two weeks can be realistic for a limited refresh with materials on hand and few trade dependencies. A full kitchen with new cabinetry, templated stone counters, backsplash and utility connections typically needs more time because several steps must happen in sequence.
How long will I be without a kitchen sink?
The main sink can be out from demolition through countertop installation and plumbing reconnect. In the six-week example above, that puts the likely return in week five or six. Ask your contractor to name the planned reconnect week before demolition and to update it after countertop templating.
Does keeping the same layout save time?
Usually, yes. Keeping the walls, sink and major appliance locations can reduce framing and utility changes. Your contractor still needs to verify existing conditions and whether your new fixtures or appliances require electrical, plumbing or ventilation upgrades.
Can I order cabinets before choosing countertops?
You can often finalize the cabinet order before the final slab selection. Agree on the countertop thickness, overhang, sink type and any island supports early enough to account for them in cabinet drawings. Confirm when the slab must be selected or reserved for your fabrication slot.
What should my contractor put in writing about the schedule?
Ask for the expected start window, construction duration, cabinet delivery, countertop template and install windows, required inspections, anticipated kitchen-use date and walkthrough. Also ask how you’ll be notified if a milestone moves.
Get a schedule for your kitchen
If you’re remodeling in Vancouver, Portland or a surrounding community, Serden Group can walk through the space with you, review your layout and material choices, and identify the steps most likely to affect your timeline. Bring any layout ideas, appliance preferences and target dates you already have.