Replacing kitchen cabinets without changing wiring, plumbing, or walls usually doesn’t require a permit. Adding an outlet, moving the sink, or removing a wall does. Where you apply depends on the property address. A home with a Vancouver, WA mailing address could be inside the city or in unincorporated Clark County, where Washington State Labor & Industries (L&I) handles electrical permits.
- Replacing cabinets, with walls, plumbing and wiring left as they are
- Adding or relocating an outlet
- Moving the sink or rerouting its pipes
- Removing or adding a wall
This checklist covers typical kitchen projects in single-family homes. If you’re remodeling a condo or a unit in a multifamily building, give the permit office the building type and scope before using the checklist.
Kitchen remodel permit checklist by location
Start with the overview to see where each change needs approval, then read the detail for your jurisdiction below it.
| What you’re changing | Portland, OR | City of Vancouver | Unincorp. Clark County |
|---|---|---|---|
| Replace cabinets only | No building permit | No building permit | No building permit |
| Add or relocate an outlet | Electrical permit | Electrical permit | Electrical permit from L&I |
| Move the kitchen sink | Plumbing permit | Plumbing approval | Plumbing permit |
| Remove or add a wall | Building permit | Residential building permit | Residential remodel permit |
| Replace the sink in the same spot | Confirm the scope | Confirm a new sink swap | Plumbing permit for a new sink |
| What you’re changing | Portland, OR | City of Vancouver, WA | Unincorporated Clark County, WA |
|---|---|---|---|
| Replace cabinets onlyKeep walls, plumbing and wiring as they are. | No building permitFor cabinet installation alone. |
No building permitFor cabinet replacement that requires no electrical or plumbing modifications. |
No building permitFor cabinet work alone. |
| Add or relocate an outletIncluding an outlet for an island. | Electrical permitFrom Portland. |
Electrical permitThrough the city. For a permitted remodel, the electrician needs an electrical permit of record. |
Electrical permitFrom Washington L&I. |
| Move the kitchen sinkOr reroute its supply, drain or vent. | Plumbing permitFrom Portland. |
Plumbing approvalThrough the city. For a permitted remodel, the city includes associated plumbing work in the residential building permit. |
Plumbing permitThrough Clark County. |
| Remove or add a wallIncluding a partition you believe is non-load-bearing. | Building permitFrom Portland. |
Residential building permitFrom the city. |
Residential remodel permitFrom Clark County. |
| Replace the sink in the same spot | Confirm the scopePortland lists replacement involving concealed connections as permit work. Describe the exact fixture and connections to the city. |
Confirm a new sink swapThe city exempts qualifying removal and reinstallation of the existing sink when valves, pipes and fixtures are left as they were. |
Plumbing permitFor installing a new sink. The county lists sink installation as work requiring a plumbing permit. |
A single kitchen remodel can involve several approvals. If you remove a wall that contains outlets or plumbing, include both the wall work and the changes to the affected utilities in your scope. If you’re adding a ducted range hood or changing a gas line, ask how mechanical or gas work should be included before you apply.
SourcesPortland residential permit requirements · Portland trade permits · Vancouver residential building permits · Vancouver municipal permit exemptions · Vancouver electrical permit rules · Clark County residential permits
Find the right permit office by address
- Verify the address. Enter the street address in PortlandMaps and check Jurisdiction in the property information.
- If it shows a different jurisdiction, confirm the permitting agency with the Oregon Building Codes Division directory.
- Check rules and apply with the Portland Permitting & Development permit guide and trade permit guide.
- Verify the address. Start with the city’s Property Information Lookup and search the county property database by address or parcel number.
- Open Administrative Data → Jurisdiction. If the field says Vancouver, use the city.
- Check rules and apply with Vancouver residential permits and online application links and the city’s remodel plan checklist.
- Verify the address. Use the county property and permit lookup.
- Read Jurisdiction. If it shows Clark County, start with the county. If it shows another city, contact that city.
- Apply in two places: the Clark County Permit Center for building and plumbing, and Washington L&I for electrical work.
Portland’s address lookup instructions show where to find the jurisdiction field. Washington L&I’s city electrical directory lists Vancouver as a city that handles its own electrical permits and inspections.
What that means for three common kitchen layouts
New cabinets with the current layout
If the new cabinets go in and the wiring, plumbing and walls stay as they are, the cabinet work qualifies for the exemptions above. If the countertop installer needs the sink disconnected, ask whether the plumber is reinstalling the existing sink, installing a new fixture or changing the valves or pipes. Those details can change the permit answer even when the cabinet layout stays the same.
A new island with power and a prep sink
The island’s new outlet adds electrical work. The prep sink adds plumbing work. Mark both locations on the proposed plan and ask your contractor how the wiring, water supply and drain will reach the island. Work that involves cutting a slab or altering framing should be disclosed when you ask about permit and plan requirements.
An open kitchen that removes a dining-room wall
Plan for a building permit in all three jurisdictions. Have the contractor identify whether the wall carries loads or has a bracing role and what wiring, plumbing or ducts pass through it. If the design changes a structural element, ask the permit office what drawings or calculations it requires before finalizing the layout.
SourcesPortland plan requirements · Vancouver residential remodel checklist
What to confirm before demolition
- Look up the street address or parcel and record the permitting jurisdiction.
- Make a list of what stays, what moves and what gets added. Include walls, outlets, appliance circuits, sink connections, range-hood ducting and gas piping where applicable.
- For layout changes, sketch the existing and proposed kitchen. Mark the wall to be removed, the new sink location and any island power.
- Ask who will apply for each permit, which fees are included in the estimate and who will schedule inspections.
- Confirm which permits must be issued before work begins and which work must remain visible for rough inspection. Ask who will verify final approval and give you copies of the permit records.
For an address-specific answer, send the permit office the property address, the two sketches and a short description of the work. A question like this gives staff enough detail to route the request:
“We’re removing a partition, moving the sink six feet and adding two island outlets. Which applications and inspections should we plan for?”
SourcesPortland permit application guide · Clark County remodel inspections
Still deciding on the layout? Read where to start with a kitchen remodel and how long a kitchen remodel takes, including where inspections fall in the schedule.
Planning a kitchen remodel in Portland or Vancouver?
At a free estimate walkthrough, Serden Group can review your proposed layout and flag the changes that affect permit planning. Bring your address and a list of what you’d like to move or add.
Call (360) 836-7775 or book online to schedule your free walkthrough.
Explore Serden Group’s kitchen remodeling services · Read the kitchen remodeling guide




